The project  consists of  structurel steel    strengthening of Areva T&D Plant thatproduce 500 – 300 MWA Hıgh-voltage Tranformers (750 ton), Structurel steel  strengthening static analysis, Structurel steel designs, Engineering and detail  projects, Construction of the structurel steel, strengthening of the plant.

Areva & Alstom

Kocaeli / Turkey

4,000 Sqm

  • Structural Design
  • Turnkey Construction
  • Project Management